Revision as of 10:46, 12 September 2008 by Jrathrey (Talk)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

I have referred to Emily Bount's solution to this question. The sampling time is alot for the code. Hence decrease the sampling time. Instead of 0.07 make it like 0.0005.

The changed code is 


F0 =13;

T0 =1/F0;

Ts = 0.0005;

t = 0:Ts:13*T0;

x = real(exp(j*(2*pi*F0*t-pi/2)));

plot(t,x).

The changed diagram is
                                   


                        Jayanth 4 ECE301Fall2008mboutin.jpg

Alumni Liaison

Basic linear algebra uncovers and clarifies very important geometry and algebra.

Dr. Paul Garrett