Line 61: | Line 61: | ||
<li> looked at camera options. In particular this one: http://www.axis.com/products/cam_m1011w/index.htm and this one: http://foscam.us/foscam-fi8918w-wireless-ip-camera-11.html axis looks like it will be easier to interface with website. Also briefly looked at wireless transceivers suggested by Jason. decided RN-XV WiFly Module http://www.sparkfun.com/products/10822 might be a good choice to start with. Posted findings on the discussion page on Rhea (30 minutes)</li> | <li> looked at camera options. In particular this one: http://www.axis.com/products/cam_m1011w/index.htm and this one: http://foscam.us/foscam-fi8918w-wireless-ip-camera-11.html axis looks like it will be easier to interface with website. Also briefly looked at wireless transceivers suggested by Jason. decided RN-XV WiFly Module http://www.sparkfun.com/products/10822 might be a good choice to start with. Posted findings on the discussion page on Rhea (30 minutes)</li> | ||
+ | |||
+ | <li> <b>Team Meeting (Tuesday)(2.5-3 hours): </b> | ||
+ | <ul> | ||
+ | |||
+ | <li> found potential parts to start prototyping with including a vehicle platform, wi-fi module, wireless camera to mount on vehicle, and proximity sensors/switches. [https://www.projectrhea.org/rhea/index.php/LRVC_Oct18 see here for details on choices]</li> | ||
+ | <li> Wrote a simple example program and loaded it onto the target development board that printed out names onto the LCD screen. </li> | ||
+ | <li> <b> TASK:</b> determine if the development board has A/D and D/A PWM ports because it is not obvious if those features are padded out on our development board. We had a very hard time finding documentation on how to use the general purpose IO as potential analog input/output. Needs to be done because we might have to find a new dev board if these features are not available. </li> | ||
+ | |||
+ | </ul> | ||
<li> Attended weekly VIP meeting. (1 hour) </li> | <li> Attended weekly VIP meeting. (1 hour) </li> |
Revision as of 17:53, 18 October 2011
Scott Stack - Design Notebook
Week of October 3rd:
|
Total Time Spent: ~1.5 hours |
Week of October 10th:
|
Total Time Spent: ~ 1.5 hours |
Week of October 17th:
|
Total Time Spent: X.X |