(New page: When calculating the expected value of X in part B, the summation is solved by using the sum of an arithmetic series. In an arithmetic series, each successive term has a constant differen...)
 
m (2b Gregory Pajot moved to 4.2b Gregory Pajot: Improperly named originally)
 
(No difference)

Latest revision as of 06:47, 15 October 2008

When calculating the expected value of X in part B, the summation is solved by using the sum of an arithmetic series. In an arithmetic series, each successive term has a constant difference, which in this case is just 1. Here we're summing from 1 to n, which equals n(n+1)/2.

In response to Arie, part B's random variable doesn't really have a typical classification (i.e., not binomial or geometric or anything) since the PMF is just 1/n.

Alumni Liaison

Basic linear algebra uncovers and clarifies very important geometry and algebra.

Dr. Paul Garrett